October 12, 2007
News for Faculty, Staff, Students & Friends
Volume 37, No. 4

Headlines


CLARK NEXSEN ARCHITECTURE AND ENGINEERING

Field of vision
ODU has unveiled plans for a Foreman Field face-lift in preparation for football in 2009. S.B. Ballard Construction Co. won the bid on the project, which gets under way in December. The main feature will be a game-day building at the south end of the field, which will include 24 luxury suites, 400 loge seats in 100 mini boxes and a special room for hosting high school recruits. Adjacent to the facility will be a 727-space parking garage. The existing stands, to include 3,000 premium seats, will seat 20,000 fans altogether. The current playing surface will be replaced by Astroturf GameDay Grass 3D.

Images and text are ©2007 Old Dominion University. This material is subject to copyright and unauthorized use is prohibited.